OEM & ODM EMERGENCY LIGHTING

Built to your brief.
Prepared for your market.

Start with a standard model or develop from a sample, drawing, technical specification or application requirement.

CUSTOMIZATION SCOPE

More than a logo change.

Our R&D and production teams evaluate the complete product configuration, from housing and electrical requirements to packaging and installation.

01Logo & brand identity
02Neutral or custom packaging
03Housing color
04Dimensions & structural design
05Labels, nameplates & manuals
06Plug & wiring method
07LED power, lumen output & CCT
08Battery type & capacity
09Emergency duration
10Input voltage & operating mode
11Installation method
12New mold development
STANDARD PRODUCTS300 pcsStarting MOQ
CUSTOM LOGO500 pcsStarting MOQ
CUSTOM PACKAGING500 pcsStarting MOQ
BATTERY / PARAMETERS1,000 pcsStarting MOQ
PROJECT FLOW

A clear route to production.

01

Requirement review

Product, market, quantity, compliance, target price and delivery requirements.

02

Proposal & sampling

Configuration review, quotation and sample preparation in approximately 7–15 days.

03

Sample approval

Mass production begins after the customer confirms the sample and order details.

04

Production & inspection

Typical production lead time is 30–45 days, subject to model and order scope.

05

Delivery support

EXW, FOB, CIF and DDP are available. Ningbo is the usual port, or we can deliver to your nominated China agent.

OEM & ODM FAQs

Which batteries and emergency duration are available?

Ni-Cd and Li-ion batteries are commonly used. Other battery types, capacity and emergency duration can be customized. The standard emergency duration is 180 minutes.

Which input voltage and operating modes are available?

The standard input is AC 220–240V, 50/60Hz. Other voltages, maintained mode and non-maintained mode can be configured according to project requirements.

What are the sample payment terms?

Sample and freight costs are paid in full before dispatch. The sample fee can be credited or refunded after a mass-production order is placed.